Friday, November 7, 2014

Animal waste threatens water supply / Addressing climate change starts at home, supermarket

 
 
Comment:  Two great letters but who in the heck is Cabbon Sudeko, I think is not a real name but great meanings!
 
Cabbon

The name Cabbon is a baby boy name.Biblical Meaning:
The name Cabbon is a
Biblical baby name. In Biblical the meaning of the name Cabbon is: As though understanding.    

SoulUrge Number: 7 People with this name have a deep inner need for quiet, and a desire to understand and analyze the world they live in, and to learn the deeper truths.
Expression Number: 1 People with this name tend to initiate events, to be leaders rather than followers, with powerful personalities. They tend to be focused on specific goals, experience a wealth of creative new ideas, and have the ability to implement these ideas with efficiency and determination. They tend to be courageous and sometimes aggressive. As unique, creative individuals, they tend to resent authority, and are sometimes stubborn, proud, and impatient.
http://www.sheknows.com/baby-names/name/cabbon

What does Sudoku mean?

There are lots of theories as to what this means, but most state that this is an abbreviation of a sudoku term.

Loosely translated, it seems to be something about numerals that can go only in a single place.

This is because 'su' apparently means 'number' and 'duoku' is a bachelor. If you know any different, then let us know!

http://www.clarity-media.co.uk/puzzle-strategy/what-does-sudoku-mean
In Japanese it is written sūdoku (数独). The characters mean "number" (sū) and "single" (doku). It is pronounced like "sue dock". However, the word "sudoku" is not in common use for these puzzles in Japan, and the word sūdoku is actually an invention.

Animal waste threatens water
Posted: Wednesday, August 13, 2014 9:51 am
To the editor,
Last weekend the drinking water of 400,000 Toledo, Ohio, residents was fouled by animal waste.
With unfettered growth of animal agriculture and ineffective discharge regulations, it will happen again in our own state.
The problem has become pervasive. Waste from chicken farms has rendered the ocean off the East Coast unfit for fishing.
Waste from Midwest cattle ranches carried by Mississippi River has created a permanent “dead zone” in the Gulf of Mexico larger than that of the infamous 2010 BP oil spill.
Animal agriculture dumps more pollution to our waterways than all other human activities combined.
Principal pollutants are animal manure, fertilizers, as well as soil particles, organic debris, and pesticides from feed cropland.
Manure and fertilizers promote growth of toxic algae that poison drinking water supplies.
Organic matter feeds microorganisms that deplete oxygen and kill fish.
Effective regulations to limit dumping of animal waste into water supplies have been blocked by the meat industry.
Fortunately, every one of us has the power to stop this outrage three times a day by saying “no” to polluting meat and dairy products.
Our local supermarket offers ample alternatives.
Entering “live vegan” in a search engine provides useful recipes and transition tips.
Cabbon Sudeko
Chatham
http://www.chathamstartribune.com/opinion/article_05dc9dcc-22f1-11e4-bdc5-001a4bcf887a.html

Addressing climate change starts at home, supermarket

Posted: Wednesday, November 5, 2014 9:16 am
Recently, hundreds of thousands marched throughout the world demanding action on climate change.
Some 120 world leaders gathered in New York for the United Nations’ Summit on Climate Change.
What can we do?
A 2006 U.N. report estimated that meat production accounts for 18 percent of manmade greenhouse gases.
A 2009 article in the respected World Watch magazine suggested that the contribution may be closer to 50 percent.
The meat industry generates carbon dioxide by burning forests to create animal pastures and by combustion of fossil fuels to confine, feed, transport, and slaughter animals.
The much more damaging methane and nitrous oxide are discharged from digestive tracts of cattle and from animal waste cesspools, respectively.
In an environmentally sustainable world, wind, solar, and other pollution-free energy sources must gradually replace polluting fossil fuels.
Similarly, vegetables, fruits, nuts, and grains must replace polluting meat and dairy products.
The large variety of widely available plant-based entrees, lunch meats, veggie burgers, cheeses, and ice creams can certainly help.
Our next trip to the supermarket is a great opportunity to start the transition to a sustainable world.
Our favorite Internet search engine offers ample product lists, recipes, and dietary tips.
Cabbon Sudeko
Chatham
http://www.chathamstartribune.com/opinion/article_6a7301c6-64f6-11e4-bef3-cf7944588cef.html?mode=print

Thursday, November 6, 2014

Local Citizens Group Granted Voice in Coal Ash Pollution Cases Against Duke Energy’s Mayo and Hyco Lake Facilities

Local Citizens Group Granted Voice in Coal Ash Pollution Cases Against Duke Energy’s Mayo and Hyco Lake Facilities

~~CHAPEL HILL, N.C.— A North Carolina Superior Court has allowed the Roanoke River Basin Association, represented by the Southern Environmental Law Center, to participate as a full party in an enforcement action with respect to two Duke Energy coal ash sites near the Virginia border: Roxboro Steam Station in Person County on Hyco Lake and Mayo Steam Station on Mayo Lake near Roxboro.  As a full party, RRBA will have the same rights as Duke Energy and DENR in the litigation.

“The state failed to ensure safe storage of Duke’s coal ash at 10 out of 14 sites, so citizen conservation groups have stepped in to finish the job,” said Frank Holleman, senior attorney at the Southern Environmental Law Center. “Every one of Duke Energy’s coal ash pits is illegally polluting North Carolina’s waters, and citizens are now enforcing the law at every single one of these sites.”

Numerous conservation groups are participating in the state court enforcement action for all the Duke Energy coal ash sites around North Carolina; RRBA previously joined the enforcement action as to the Dan River site, where Duke Energy’s disastrous coal ash spill occurred in February. The N.C. Department of Environment and Natural Resources brought the statewide enforcement actions last year in response to a Clean Water Act notice sent by the Southern Environmental Law Center on behalf of Cape Fear River Watch, Waterkeeper Alliance, and the Sierra Club.

“Duke stores a huge proportion its coal ash in leaking, unlined pits in the Roanoke River basin, and we must make certain that DENR takes the appropriate action to fix the problem,” said RRBA President Gene Addesso. “We will fight to ensure Duke is held accountable for illegally polluting the rivers and lakes of the Roanoke basin and that Duke’s coal ash is removed to lined, dry storage.”

The coal ash dams at both Roxboro and Mayo are High Hazard dams according to the state of North Carolina.  Duke stores 6.9 million tons of coal ash at its Mayo plant and 16.4 million tons at its Roxboro plant.  Scientists from Duke University have found elevated levels of arsenic and other coal ash pollution in Hyco Lake and Mayo Lake in recent years.  Fish deformities due to selenium coal ash poisoning have been found in Mayo Lake, and in 2008 a coal ash dam at Roxboro suffered a structural failure.

The coal ash legislation passed by the N.C. General Assembly this summer would allow DENR and a politically-appointed commission to decide whether coal ash can remain in place at these sites.  A federal criminal grand jury is investigating DENR’s relationship with Duke Energy.

###
About the Roanoke River Basin Association
The Roanoke River Basin Association is a non-profit organization based in Danville, Virginia, whose mission is to establish and carry out a strategy for the development, use, preservation and enhancement of the resources of the Roanoke River system of lakes and streams in the best interest of present and future generations.  RRBA consists of hundreds of members, primarily located within the 410-mile-long Roanoke River basin in Virginia and North Carolina, including local governments; non-profit, civic and community organizations; regional government entities; businesses and individuals.    http://prod.rrba.org/
.
About the Southern Environmental Law Center
The Southern Environmental Law Center is a regional nonprofit using the power of the law to protect the health and environment of the Southeast (Virginia, Tennessee, North and South Carolina, Georgia, and Alabama). Founded in 1986, SELC's team of more than 60 legal and policy experts represent more than 100 partner groups on issues of climate change and energy, air and water quality, forests, the coast and wetlands, transportation, and land use.
www.SouthernEnvironment.org

https://www.southernenvironment.org/news-and-press/press-releases/coal-ash-pollution-cases-against-duke-energy

Tuesday, November 4, 2014

Dominion Asks FERC To Begin Environmental Review Of Atlantic Coast Pipeline




Dominion Asks FERC To Begin Environmental Review Of Atlantic Coast Pipeline
 
Published: October 31, 2014 04:01 PM
The Providence Journal
Published: October 31 2014 04:01


RICHMOND, Va., Oct. 31, 2014 /PRNewswire/ -- Dominion , on behalf of its joint venture partners in the Atlantic Coast Pipeline, today submitted a request to begin the pre-filing process with the Federal Energy Regulatory Commission (FERC), asking the commission to begin its environmental review of the proposed $4.5 billion to $5 billion, 550-mile natural gas pipeline.

Four major U.S. energy companies - Dominion, Duke Energy , Piedmont Natural Gas and AGL Resources - plan to build and own the pipeline, which would run from Harrison County, W.Va., southeast through Virginia with an extension to Chesapeake, Va., and then south through eastern North Carolina to Robeson County. The pipeline would help meet the growing clean energy needs of Virginia and North Carolina by providing direct access to the burgeoning natural gas production in the Marcellus and Utica shale basins of West Virginia, Pennsylvania and Ohio.

"The broad and enthusiastic support we have received since announcing the project last month is further evidence of how important the Atlantic Coast Pipeline is to the future of the region," said Diane Leopold, president of the company's Dominion Energy business unit. "Along with creating thousands of jobs and millions of dollars in new tax revenues for states and localities, it can act as a catalyst for future economic development, help stabilize energy prices for consumers and businesses, and promote cleaner air."

Govs. Terry McAuliffe of Virginia, Earl Ray Tomblin of West Virginia and Pat McCrory of North Carolina each talked about the economic growth and jobs that are expected to occur along the pipeline when the project was announced Sept. 2. More than 30 federal, state, and local elected officials, and chamber of commerce or economic development groups have provided letters of support or passed resolutions in favor of the project. In addition, more than 5,500 letters of support have been received by elected officials in Virginia, West Virginia and North Carolina.

A study by Chmura Economics & Analytics estimates that the project can generate a total of $2.7 billion in economic impact from 2014 through 2019 in the three-state region, supporting 17,240 cumulative jobs.

The project also promises significant environmental benefits. Much of the natural gas to be transported by the pipeline will replace coal in the generation of electricity -- a transition that's already well under way in both Virginia and North Carolina as older, less efficient coal units are retired.

Natural gas burns cleaner than coal and emits about half the carbon dioxide.

From 2008 to 2013, demand for gas-fired electric power generation grew by 459 percent in North Carolina and 123 percent in Virginia. The U.S. Energy Information Administration's 2014 Annual Energy Outlook reported that overall, demand for natural gas for all uses grew by 50 and 37 percent in North Carolina and Virginia, respectively, between 2008 and 2012.

The extensive FERC review process that begins with pre-filing solicits input from numerous local, state and federal entities, and private citizens. Public safety, air quality, water resources, geology, soils, wildlife and vegetation, threatened and endangered species, land and visual resources, cultural and historic resources, noise, cumulative impacts and reasonable alternatives are fully examined. The project will need the approvals of 40 federal, state and local regulatory agencies before construction can begin.

"This is the formal beginning of a comprehensive and detailed review process by the FERC and other agencies that will examine this project from every angle," Leopold said. "It is an open process with many opportunities for participation by the public."

In the pre-filing request to the FERC, Dominion noted it has begun a wide-ranging outreach and education program for stakeholders.

So far, the program has included 13 informational open houses along the route attended by more than 3,600 people. Additional open houses will be scheduled for January 2015, followed by FERC-led scoping meetings shortly thereafter.

Informational packets also will be mailed to about 5,500 property owners along the proposed pipeline route and within a half-mile of potential compressor station locations.

Dominion is surveying to determine the best route, one that meets operational and reliability needs while minimizing the impact on the environment as well as historical and cultural resources.

The company expects to file its FERC application next summer, receive the FERC Certificate of Public Convenience and Necessity in the summer of 2016 and begin construction shortly thereafter. The pipeline is expected to be in service by late 2018.

The main pipeline would have a 42-inch diameter in West Virginia and Virginia, reducing to 36 inches in diameter in North Carolina. Virginia and North Carolina have limited access to supplies from the Marcellus and Utica shales and have a need for increased infrastructure to support growing demand for natural gas-fired generation, and to add supply diversity for reliability and price stability.

More information about the Atlantic Coast Pipeline is available on the Web at dom.com/acpipeline and on Facebook at www.facebook.com/acpipeline

.
More information about the FERC pre-filing process is available at http://www.ferc.gov/help/processes/flow/gas-4.asp
 and http://www.ferc.gov/help/faqs/prefiling.asp
 .
About DominionDominion is one of the nation's largest producers and transporters of energy, with a portfolio of approximately 23,600 megawatts of generation, 10,900 miles of natural gas transmission, gathering and storage pipeline, and 6,400 miles of electric transmission lines. Dominion operates one of the nation's largest natural gas storage systems with 947 billion cubic feet of storage capacity and serves utility and retail energy customers in 10 states. For more information about Dominion, visit the company's website at www.dom.com
.
Media contact: Frank Mack, (804) 771-3141; frank.mack@dom.com
 Investor contact: Kristy Babcock, (804) 819-2492; kristy.r.babcock@dom.com

About Duke EnergyDuke Energy is the largest electric power holding company in the United States with approximately $115 billion in total assets. Its regulated utility operations serve approximately 7.2 million electric customers located in six states in the Southeast and Midwest. Its commercial power and international energy business segments own and operate diverse power generation assets in North America and Latin America, including a growing portfolio of renewable energy assets in the United States. Headquartered in Charlotte, N.C., Duke Energy is a Fortune 250 company traded on the New York Stock Exchange under the symbol DUK. More information about the company is available at: www.duke-energy.com
.
Media contact: Dave Scanzoni, (800) 559-3853Investor contact: Bill Currens, (704) 382-1603
About Piedmont Natural GasPiedmont Natural Gas is an energy services company primarily engaged in the distribution of natural gas to more than one million residential, commercial, industrial and power generation utility customers in portions of North Carolina, South Carolina and Tennessee, including customers served by municipalities who are wholesale customers. Our subsidiaries are invested in joint venture, energy-related businesses, including unregulated retail natural gas marketing, and regulated interstate natural gas transportation and storage, and regulated intrastate natural gas transportation businesses. More information about Piedmont Natural Gas is available on the Internet at http://www.piedmontng.com
/.
Media contact: David Trusty, (704) 731-4391, david.trusty@piedmontng.com
 Investor contact: Nick Giaimo, (704) 731-4952, nicholas.giaimo@piedmontng.com

About AGL Resources AGL Resources is an Atlanta-based energy services holding company with operations in natural gas distribution, retail operations, wholesale services and midstream operations. AGL Resources serves approximately 4.5 million utility customers through its regulated distribution subsidiaries in seven states. The company also serves approximately 630,000 retail energy customers and approximately 1.2 million customer service contracts through its SouthStar Energy Services joint venture and Pivotal Home Solutions, which market natural gas and related home services. Other non-utility businesses include asset management for natural gas wholesale customers through Sequent Energy Management and ownership and operation of natural gas storage facilities. AGL Resources is a member of the S&P 500 Index. For more information, visit www.aglresources.com
Media contact: Tami Gerke, (404) 584-3873, tgerke@aglresources.com
 Investor contact: Steve Cave, (404) 584-3801, scave@aglresources.com

This news release includes certain "forward-looking information." Examples include information as to our expectations, beliefs, plans, goals, objectives and future financial or other performance or assumptions concerning matters discussed in this release. Factors that could cause actual results to differ from those in the forward-looking statements may accompany the statements themselves. In addition, our business is influenced by many factors that are difficult to predict, involve uncertainties that may materially affect actual results and are often beyond our ability to control or estimate precisely, such as estimates of future market conditions, access to and costs of capital, the receipt of regulatory approvals for, and timing of, planned projects and compliance with conditions associated with such regulatory approvals, and the ability to complete planned construction or expansion projects within the terms and timeframes initially anticipated. We have identified and will in the future identify a number of these factors in our SEC Reports on Forms 10-K and 10-Q. We refer you to those discussions for further information. Any forward-looking statement speaks only as of the date on which it is made, and we undertake no obligation to update any forward-looking statement to reflect events or circumstances after the date on which it is made.
http://www.providencejournal.com/business/press-releases/20141031-dominion-asks-ferc-to-begin-environmental-review-of-atlantic-coast-pipeline.ece
 

Monday, November 3, 2014

Landowners seek legal rights in pipeline dispute

  

Landowners seek legal rights in pipeline dispute

Posted: Oct 28, 2014 11:13 PM EDT Updated: Oct 28, 2014 11:16 PM EDT

Friday, October 31, 2014


Mountain Valley Pipeline sponsors have submitted a pre-filing request to FERC.

Also for your future reference, the Docket No. is PF15-3. All the docs and correspondence filed in regard to this project can be accessed through eLibrary at
FERC General Search:  http://elibrary.ferc.gov/idmws/search/results.asp






Category/
Accession
Doc Date/
Filed Date
Docket
Number
DescriptionClass/
Type
FilesSize




 
Submittal
20141029-5000
10/28/2014
10/29/2014
PF15-3-000Comment of Kirsti Kaldro in Docket(s)/Project(s) PF15-3. Submission Date: 10/28/2014
Availability: Public
Comments/Protest /
Comment on Filing

 Text    0K

 FERC Generated PDF    8K
INFO

FILE
Submittal
20141029-5005
10/28/2014
10/29/2014
PF15-3-000Comment of Kirsti Kaldro concerning the Mountain Valley Pipeline Project under PF15-3.
Availability: Public
Comments/Protest /
Comment on Filing

 Word    13K

 FERC Generated PDF    7K
INFO

FILE
Submittal
20141029-5085
10/29/2014
10/29/2014
PF15-3-000Comment of William Corn in Docket(s)/Project(s) PF15-3-000 Submission Date: 10/29/2014
Availability: Public
Comments/Protest /
Comment on Filing

 Text    0K

 FERC Generated PDF    7K
INFO

FILE
Submittal
20141027-0030
10/22/2014
10/27/2014
PF15-3-000Comments of Tom Hoffman re the Mountain Valley Pipeline Project under PF15-3.
Availability: Public
Comments/Protest /
Comment on Filing

 Image    33K

 FERC Generated PDF    42K
INFO

FILE
Submittal
20141027-0033
10/20/2014
10/27/2014
PF15-3-000Comments of Sharon Parker re the proposed Mountain Valley Pipeline Project under PF15-3.
Availability: Public
Comments/Protest /
Comment on Filing

 Image    47K

 FERC Generated PDF    57K
INFO

FILE
Submittal
20141027-0034
10/19/2014
10/27/2014
PF15-3-000Comments of Robert K. Johnson et al re the proposed Mountain Valley Pipeline Project under PF15-3.
Availability: Public
Comments/Protest /
Comment on Filing

 Image    35K

 FERC Generated PDF    43K
INFO

FILE
Submittal
20141027-5073
10/27/2014
10/27/2014
PF15-3-000Report of Mountain Valley Pipeline LLC Request to Initiate NEPA Pre-Filing Process under PF15-3.
Availability: Public
Report/Form /
157.207 Annual Construction Report

 PDF    401K

 PDF    284K

 PDF    39K

 PDF    76K

 PDF    89K

 PDF    142K

 FERC Generated PDF    1060K
INFO

FILE
Submittal
20141027-5136
10/27/2014
10/27/2014
PF15-3-000Pre-Filing Request of Mountain Valley Pipeline LLC Pre-Filing Request under PF15-3.
Availability: Public
Applicant Correspondence /
Supplemental/Additional Information

 PDF    217K

 PDF    284K

 PDF    39K

 PDF    76K

 PDF    89K

 PDF    142K

 FERC Generated PDF    905K
INFO


Meeting: Mountain Valley Pipeline – Presentation on gas line project




PITTSYLVANIA COUNTY BOARD OF SUPERVISORS
REGULAR MEETING

 
 
 
MONDAY, NOVEMBER 3, 2014
GENERAL DISTRICT COURTROOM
EDWIN R. SHIELDS COURTHOUSE ADDITION
AGENDA


1. Call to Order – 7:00 p.m.
2. Roll Call
3. Pledge of Allegiance
4. Items to be added to the Agenda
(a)

APPROVAL OF AGENDA
HEARING OF CITIZENS
CONSENT AGENDA


5. (a) Minutes: October 1, 2014 – Work Session
October 6, 2014 – Regular Meeting
October 7, 2014 – Work Session
October 21, 2014 – Adjourned Meeting


(b) Bill List – October 2014 (Online)


(c) Holiday Time
(d) Fire & Rescue Insurance – Statement by Public Body

PUBLIC HEARINGS


6. Public Hearing to receive citizen input on a proposed amendment to Pittsylvania County Code ("PCC") § 8-4.1, Term of Office that would with incorporate staggered terms for the Pittsylvania County Board of Supervisors beginning the November 2015 General Election.
7. Public Hearing to receive citizen input on proposed amendments to Pittsylvania County Code ("PCC") § 9-54, Failure to Pay License Fee, Personal Property Tax, Etc.; Penalty. Specifically, the following amendments are proposed to § 9-54 (A) and (B) to include license fees and/or personal property taxes that would be considered delinquent after June 5; and § 9-54 (C) § 9-54 violations of to be reduced from a Class 4 misdemeanor with a $250 fine to a civil fine of 25.

PRESENTATIONS


8. Mountain Valley Pipeline – Presentation on gas line project
9. Danville-Pittsylvania Community Services Board FY2013/14 Annual Report
& Annual Services Contract
10. Delinquent Tax Collections – M. Kate Berger, Treasurer
11. Economic Development Strategy Plan – Staff presentation

NEW BUSINESS


12. Request for Public Hearing – Proposed First Responder Fees
13. Department of Motor Vehicles – Pet Friendly Tags Fund
14. Appropriation for Feasibility Analysis – Tank Museum
APPOINTMENTS
15. Nominations – Pittsylvania County Building Code Board of Appeals; Chatham/Blairs, Staunton River, and Tunstall Electoral Districts

BOARD ANNOUNCEMENTS
REPORTS FROM LEGAL COUNSEL
REPORTS FROM COUNTY ADMINISTRATOR
ADJOURNMENT

Thursday, October 30, 2014

Too Many Pipelines: Not Needed




Comments:  Please write FERC with your concerns, why do we need 3 pipelines going the same way?  It appears that a former pipeline runs thru a proposed uranium mining, will it be moved?  So it Pittsylvania County, TRANSCO will be receiving gas from Mountain View and Sunset going to Lawrenceville, VA.....so why two pipelines going the same way?

Look at the pipelines:

Environmental Assessment for the Leidy Southeast Expansion Project (CP13-551)
Issued August 11, 2014 :       http://www.ferc.gov/industries/gas/enviro/eis/2014/08-11-14-ea.asp

     transco simple map

Leidy Southeast Expansion Project Environmental Assessment


M&R Stations
Columbia Gas of Virginia - AltaVista M&R Station Pittsylvania County, VA <0.1 <0.1 0.1 0.0 0.0 0.0 0.1 <0.1
Pittsylvania, VA Central Virginia Intrastate (81.143) CO, NO2, O3, Pb, PM10, PM2.5, SO2 none
Pittsylvania, VA 0.3 2.4 0.2 / 0.2 0.2 4.8
165 Pittsylvania, VA Mainline 1413.0 Install deodorization facilities that filter odorant from gas streamprior to any planned release.
 



 



Pipeline company moves to initiate federal review of proposal

By Duncan Adams duncan.adams@roanoke.com 981-3324 | Posted: Tuesday, October 28, 2014 8:00 pm
Mountain Valley Pipeline LLC asked the Federal Energy Regulatory Commission on Monday to begin its informal review of the company’s proposed 300-mile interstate natural gas transmission pipeline.

As envisioned, the $3 billion-plus pipeline project, a joint venture of EQT Corp. and NextEra Energy, would pump natural gas at high pressure through a 42-inch diameter pipe from northwestern West Virginia to southern Virginia. Mountain Valley had previously said the pipeline would be either 36 inches in diameter or 42 inches, but the larger diameter was specified in Monday’s FERC filing.

The proposed pipeline route would take it through 16 counties, including five in Virginia: Giles, Montgomery, Roanoke, Franklin and Pittsylvania.

On Monday, Mountain Valley asked FERC to initiate the agency’s pre-filing process. Tamara Young-Allen, a spokeswoman for FERC, said the process is designed to engage stakeholders, including landowners as well as local, state and federal agencies, to “identify and resolve issues before the formal filing of an application with the commission.”

Mountain Valley, which would need FERC approval to proceed to construction, said it plans to file a formal application sometime in late October or early November 2015. The company reported plans to begin construction in January 2017 and bring the pipeline into service in December 2018.

FERC has assigned a docket number — PF15-3 — for Mountain Valley’s submission and related documents. The docket number provides online access to the pipeline’s filings at FERC.gov and an opportunity to comment on and follow project filings at www.ferc.gov/docs-filing/ferconline.asp.

As of Tuesday, comments filed included three letters expressing opposition to the pipeline. The authors live in Giles County, Blacksburg and Roanoke County. They cited a host of concerns, ranging from groundwater contamination and other environmental damage to fears about pipeline safety hazards and impact on property values.

Natalie Cox, a spokeswoman for EQT Corp., said Tuesday that as of Oct. 24, Mountain Valley Pipeline had contacted a total of 1,725 landowners, including 700 in Virginia, to seek permission to access their land to consider it for the pipeline route.

In an email, Cox reported, “We have received authorization to survey property from approximately 80 percent of landowners on the proposed route.” About 10 percent have denied permission, she said. The remaining 10 percent includes landowners earmarked for follow-up contact, Cox said.

She said Mountain Valley envisions holding open houses in December and January in counties along the pipeline route to discuss the project and address concerns. FERC staff will participate in these events as part of the pre-filing process.

The pipeline would transport natural gas extracted through hydraulic fracturing, or fracking, from Marcellus and Utica shale formations in northern West Virginia, southwestern Pennsylvania and Ohio. The delivery point would be a compressor station for the Transcontinental transmission pipeline in Pittsylvania County.

EQT Corp. and NextEra Energy have said the Mountain Valley Pipeline will meet demand for natural gas in the mid-Atlantic and Southeast regions of the United States.

The joint venture has not denied that some of the natural gas might end up being exported.
“Our primary goal is to deliver gas from the Marcellus and Utica [shales] to communities along the proposed Mountain Valley Pipeline route,” Cox said in an email.

“However, it would be disingenuous for us to say that we have control over what happens with the gas once it reaches Transco Station 165 in Chatham, Virginia,” she wrote.
 
 


Sunday, October 26, 2014

Pipelines Meetings: Understanding Your Legal Rights – Mountain Valley Pipeline: October 28 @ 7:00 pm, Mountain Valley Pipeline Issues: Tuesday October 28 At 12 PM - 2:30 PM. SONGS OF SOCIAL SIGNIFICANCE: Oct 27, Monday at 7:00pm /Factory Chicken Farms Meetings: Meeting Oct. 27 6 PM will provide information to potential contract growers, Meeting Oct. 28 6:30 PM will have an overview of how a poultry complex would affect the community with Q&A.

Gas pipe along ditch


Pipelines Meetings: Understanding Your Legal Rights – Mountain Valley Pipeline: October 28 @ 7:00 pm,  Mountain Valley Pipeline Issues  /Meeting:  Mountain Valley Pipeline Issues Tuesday October 28 At 12 PM - 2:30 PM. SONGS OF SOCIAL SIGNIFICANCE - David Rovics Plays for People, Peace and Planet Monday at 7:00pm



Factory Chicken Farms Meetings: 
Meeting Oct. 27 6 PM will provide information to potential contract growers
Meeting Oct. 28 6:30 PM will have an overview of how a poultry complex would affect the community with Q&A.

From KM:  Please be aware of the important informational meetings below.  Forward the information to other you know to be on or near proposed pipeline paths.

There are some websites and blogs that aid in understanding impacts of fracking gas pipe lines and your rights (or lack thereof) as a property owner.  One such website is http://preservethenrv.com/  This is the homepage. 

Make sure to click the tabs at the top to access pertinent information. http://prideva.blogspot.com/ also has information.

Trying to keep up with the plethora of Proposed Pipelines in Pittsylvania (PPP) is becoming quite a task.  The Mountain Valley Pipeline (MVP) proposed path includes the counties of Giles, Pulaski, Montgomery, Roanoke, Franklin and Pittsylvania.  Floyd County was considered initially, but later dropped.  The Pipeline reps. said it was due to trying to avoid scenic issues like the Appalachian trail and Blue Ridge Parkway.  However, early opposition from Floyd residents and Supervisors and the desire to protect their water was fierce.  Other counties along the route are taking notice, educating themselves, asking questions and favoring opposition as well.

This weeks Star Tribune reports that the pipeline will cover 15-20 miles in Pittsylvania and will affect about 120 land owners.  The article quotes pipeline spokesperson Natalie Cox. The article states that Cox said that companies are seeking permission to walk properties and stake routes.  

She also said (according to the article) that company representatives have talked with county officials and are looking forward to starting a dialogue with landowners.  RED FLAG...There was no notice on any agenda (in open or closed session) for Pittsylvania County that show evidence of such a meeting with county officials.  Even so, it appears some supervisors have met with MVP reps. in groups of less than 3 to avoid public notice.  Also odd is Cox stating that they are seeking permission to walk properties and then says are looking forward to starting a dialogue with landowners!!!  Sounds like putting the cart before the horse.

 
Meeting:  Understanding Your Legal Rights – Mountain Valley Pipeline
Time: 7:00 pm October 28
Blacksburg Unitarian Universalist Congregation Church
1301 Gladewood Drive NW,Blacksburg,VA United States

Joe Lovett (Executive Director of Appalachian Mountain Advocates), Isaac Howell (a FERC expert in Roanoke), and Elise Keaton (director of Keeper of the Mountains Foundation in WV) will be here to provide information specifically on the Mountain Valley Pipeline as to how we can proceed and helping us understand our legal rights (although they cannot solicit legal clients or recommend specific legal counsel). They can provide us information on how to proceed with FERC as well as other government agencies involved in regulating natural gas distribution. They will also be able to assist us in organizing locally and with other groups they are helping in Virginia and West Virginia. While their presentation is free, donations to fund their work as a non-profit are appreciated.
Date: October 28
 

Meeting:  Mountain Valley Pipeline Issues
Tuesday October 28 At 12 PM - 2:30 PM
 
 
At the Franklin County Library
355 Franklin St., Rocky Mount, VA
It's time to organize! Next Tuesday, at noon, at the Franklin County Library, we will gather to discuss issues related to the proposed Mountain Valley Pipeline.

Affected landowners will be present as well as supportive allies to assist in the formation of a strong group to coordinate, educate, and inspire people to take action.

If you're interested in helping, please join us!
 
 
 
 
Monday at 7:00pm
Monday night at 7:00pm, come see in concert David Rovics, a living legend in the activist community, and meet volunteers working for peace (from sponsor Plowshare Peace Center), for many progressive causes (from sponsor P.A.N.O.R.), and for stopping the Mountain Valley Pipeline (from Floyd, Montgomery, Franklin, and of course Roanoke counties).
Because stopping the pipeline is an urgent issue facing our region right now, the main focus of this concert will be on raising awareness and support for this cause. So come on out, hear amazing activism-driven music, and make connections with great people and great causes!
 
POOP:   Pittsylvania County Meetings
 
February of this year an amendment to Pittsylvania's zoning ordinance was proposed to lay the groundwork to abolish R-1 (residential) designations in favor of R-A (residential agriculture.  This would increase minimum lot size, allow sludge to be spread near your property line and restrict your ability to use your property to accommodate the sludge spreaders.  Why?  It looks like Pittsylvania has some big proponents of a "poultry complex"  which would include a hatchery, feed mill and processing plant and approximately 100 contract growers within about a 50 mile radius of the feed mill and processing plant.  So, there will be a lot of sludge (some classified as industrial) to spread around.  This should leave everyone's well water in tip-top shape!
 
Posted on: October 16, 2014

Interested in Being a Contract Poultry Grower?


A meeting will be held at the Old Dominion Agricultural Complex
 at Chatham, VA
on October 27 at 6:00 pm

 for people interested in becoming a poultry contract grower. The purpose of the meeting is to provide an overview of what is involved in being a contract poultry grower and to help gauge interest in being a contract grower. The presentation will be followed by a question and answer session. A short survey will handed out at the end of the meeting. Responses will be anonymous.
 
 
Posted on: October 16, 2014

Poultry Complex Feasibility Study:  Meeting: 


A public meeting will be held at the Old Dominion Agricultural Complex
at Chatham, VA
on October 28 at 6:30 pm.

The purpose of the meeting is to get input for a study determining the feasibility of locating a poultry complex in Pittsylvania County. An overview of how a poultry complex would affect the community will be provided followed by a question and answer session. A short survey will be handed out at the end of the meeting. Responses will be anonymous.
This meeting is part of a study funded by the Pittsylvania County Board of Supervisors to determine the feasibility of locating a poultry complex in Pittsylvania County. The study and meeting are being conducted by BR Bock Consulting, Inc. A poultry complex would include a hatchery, feed mill, and processing plant in Pittsylvania County, and approximately 100 contract growers within about a 50-mile radius of the feed mill and processing plant. Major considerations in the study are infrastructure, workforce, environmental, potential contract grower base, and public acceptance.
 
 
Meeting Oct. 27 6 PM will provide information to potential contract growers
Meeting Oct. 28 6:30 PM will have an overview of how a poultry complex would affect the community with Q&A.
 
The meetings are to seek public input on a county poultry study that is being funded by the county ($10,000) and the Gov.'s Agriculture and Forestry Development Fund ($10,000). The study and meeting are being conducted by BR Bock.  Please visit their website http://brbock.com/index.html  The only thing Bock seems to study is how to make the most out of  poo  We in Pittsylvania County will be in a world of  **it and your tax dollars will have funded the study designed to make it happen. 

 
 

Dominion starts making adjustments to pipeline route

BY BRIAN CARLTON The (Waynesboro) News Virginian | Posted: Saturday, October 25, 2014 7:45 pm
WAYNESBORO — More letters are going out to property owners in Virginia, as Dominion Resources makes adjustments to the proposed route of the Atlantic Coast Pipeline project. Company officials said the plan underwent what they call a “minor” rerouting after several public meetings were held over the last two months.
 
“We have an initial route, which we continue to modify based on important and ongoing feedback from landowners and other interested parties,” said Frank Mack, manager of Dominion Transmission Communications. “There have been some minor route adjustments, based on what our surveyors have found and what landowners have requested.”
 
As of this week, letters had gone out to property owners of 3,265 tracts across West Virginia, Virginia and North Carolina, asking permission for Dominion employees to survey the property. Now, that number has climbed to 3,331.
 
Out of the new total, Dominion records show that 72 percent of landowners have given the company permission to survey and 12 percent have declined. Mack said discussions continue with the remaining 16 percent of property owners.
 
Actual purchase of the right-of-way easements is expected to take place in the spring, Mack said. Right now, he said, the focus is on getting permission to survey all of the properties.
 
The company surveys individual properties to avoid running into issues such as a family cemetery plot, which both Mack and fellow Dominion spokesman Jim Norvelle said in the past the company would not go through. That’s one of the examples given of why the pipeline has been rerouted.
Mack said the route through Augusta and Nelson counties has gone through some minor changes, but more alterations could be on the way. Dominion plans to hold open houses to discuss the changes with residents in early 2015, Mack said, ahead of additional meetings that the Federal Energy Regulatory Commission will call for, as the official application for the project is filed. A final “preferred” route is expected to be ready to present to FERC by the summer, he said.
The public can express its views on the pipeline once FERC takes it under consideration. Tamara Young-Allen, a spokeswoman for FERC, cautioned people not to expect the same route and overall project by the end of the process.
“No pipeline project looks the same from when it’s first proposed to when FERC issues its final recommendation,” Young-Allen said.
Dominion is currently in the pre-filing process. Once that’s done and the application has been submitted, FERC then lets the people know they can offer comment or testify before the commission as what’s known as an “intervener.”
“Anyone who can show that no one else can represent their views can intervene,” Young-Allen said. “These people are the ones who take a formal stand about the pipeline before the commission. They have the ability to appeal the commission decisions, as well.”
While testimony is being heard, the project also is being evaluated by FERC staffers. They look at any potential problems with the current plan, as well as alternatives to the proposed route.
This isn’t a short process and an answer won’t be quick in coming, Young-Allen said. Normally, it takes between 12 to 18 months to get a decision, with the clock starting after a company has filed a formal application.
A map of the revised route is not yet available for viewing.
 

Dominion starts adjusting pipeline route

By BRIAN CARLTON The News-Virginian | Posted: Friday, October 24, 2014 10:30 pm
WAYNESBORO — More letters are going out to property owners in Virginia this week, as Dominion Resources Inc. adjusts the proposed route of the Atlantic Coast Pipeline project.
Company officials said the plan underwent what they call a “minor” rerouting after a series of public meetings held over the past two months.
“We have an initial route, which we continue to modify based on important and ongoing feedback from landowners and other interested parties,” said Frank Mack, a spokesman for Dominion Transmission, a subsidiary of Dominion Resources. “There have been some minor route adjustments, based on what our surveyors have found and what landowners have requested.”
Dominion Resources is forming a joint venture with three other major energy companies to build and own a $4.5 billion to $5 billion, 550-mile natural gas pipeline from West Virginia through Virginia and into North Carolina. Letters have gone out to property owners of 3,331 tracts across the three states, asking permission for Dominion employees to survey the property.
Dominion records show that 72 percent of landowners have given the company permission to survey and 12.1 percent have declined. Mack said discussions continue with the remaining 15.9 percent of property owners. Actual purchase of the right of way easements is expected to take place in the spring.
Mack said the focus now is getting permission to survey all the properties. Company officials need to survey individual properties to avoid running into such issues as family cemetery plots, which the company has said it will not go through. That’s an example given of why the pipeline has been rerouted.
Dominion plans to hold additional open houses in early 2015 to discuss changes with residents, Mack said.  A final “preferred” route is expected to be ready to present to the Federal Energy Regulatory Commission by summer 2015, he said.
http://www.timesdispatch.com/business/energy/dominion-starts-adjusting-pipeline-route/article_044594ef-230a-51f1-8f8d-d7735af0f3c5.html